Manitowoc MULTIPLEX 11M Specifiche Pagina 73

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 72
Part Number STH12 9/10 73
PLACING THE CARBONATION SYSTEM IN
OPERATION
1. Open the CO
2
gas supply valve at CO
2
tanks or
bulk tank. Adjust the CO
2
pressure to 90 psi
(6.2 bar).
2. Open relief valve on top of the carbonator tank for
4 seconds to bleed off air in tank.
3. Turn ON the water supply to unit.
4. Turn ON the switch labeled “Carbonator Pump”.
Allow carbonator to run and cycle OFF.
5. Activate all valves until a smooth, continuous flow
of carbonated water and non-carbonated water
appear at the valves.
6. Turn ON switch labeled “Circulator”.
7. Allow at least 1 hour before proceeding to
calibration instructions. You may complete the
sanitizing instructions during this period.
Vedere la pagina 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 235 236

Commenti su questo manuale

Nessun commento